Reference/ Residential/ Al Barari Villas

Al Barari
Villas

Four villas sharing one structural system and one envelope package, built in sequence so each house starts with what the last one taught us. Handover is staged across eleven months rather than delivered in a single week.

Villa with white render and full-height glazing nearing completion
4Villas
1Structural system
11Months of staged handover
3Topped out

The brief

A developer client with four adjacent plots who wanted four distinct houses, not four copies of one house. The plans differ, the elevations differ, and the buyers should never be able to tell that anything underneath them is shared.

What it took

One structural grid and one envelope specification carrying four different plans. Repetition everywhere nobody looks, variation everywhere they do. Building them in sequence rather than in parallel costs programme and buys something more valuable: every detail that went wrong on villa 01 was designed out before villa 02 was priced.


Where it stands

01

Villa 01

Handed over and occupied. Its defects list became the pre-start checklist for the other three

Complete
02

Villa 02

Second fix and joinery. Two junctions re-detailed off the back of villa 01

Fitting out
03

Villa 03

Envelope complete, watertight. Glazing installed to the same cast-in fixings as 01 and 02

Envelope
04

Villa 04

Substructure poured, frame starting

Substructure

Status as at the last site report. Completion is staged through 2027 — see the snagging list we did not need for how the mock-up sequence on villa 01 was set up.

“The second house was better than the first, and the third was better again. That is what we were buying.”

Developer, Al Barari

Credits

01

Contract

Design & build, four plots under one agreement

02

Scope

Substructure, frame, envelope, MEP, fit-out, landscape, commissioning

03

Status

On site — completion staged through 2027