Tell us the scope and the site. If there is a drawing set, say so — we would rather price the real thing than a description of it.


We reply to every enquiry within two working days.

Studio

Dubai Design District
Building 6, Level 3
Dubai, United Arab Emirates

Talk to us

build@esg.example

Tenders

tenders@esg.example
Drawing sets to 250 MB accepted

Hours

Sunday — Thursday, 08:00–18:00 GST
Site visits by arrangement

Completed residence

Before you write

Questions we get asked first.

Private residences from roughly 400 m² upward, interiors from 150 m², and developments up to about 12,000 m². Below that we are usually the wrong contractor and will say so.

A 1,000–1,500 m² residence typically runs 20–26 months from site possession, assuming a complete drawing set at start. Sloped or rock sites add two to four months at substructure.

Preferably. Most of our work arrives through architects and we are comfortable being the contractor rather than the designer. Where there is no architect, our technical team can take the design.

Yes, and we do it regularly. It starts with a paid condition survey — we will not price a takeover from photographs, because what is already buried is the whole question.

Twelve months of defects cover with a scheduled three-month and eleven-month inspection, plus commissioning records, O&M manuals and the digital twin so any future contractor can pick it up.