Journal

From
The Site

Notes on things we got right, things we got wrong, and details worth writing down before we forget why we did them that way.


Aug 2026

Why we pour the frame to the mullion

Glazing is usually procured after the structure is up, which means the façade absorbs every millimetre of frame tolerance. We buy it eleven months early and pour to it instead. Here is what that costs and what it saves.

Envelope · 5 min
Read
Jul 2026

Sixty-two piles into rock

The Jebel Vista substructure took four months longer than the programme said it would, and every week of it was in the ground conditions report nobody costed.

Structure · 4 min
Read
Jun 2026

One scene list, five years later

We went back to a house we commissioned in 2021 to see which scenes the owners actually use. Two of eleven. This has changed how we hand over.

Systems · 3 min
Read
May 2026

GGBS at 50%: what actually happened

Replacing half the cement changed the set time, the colour and the site programme. The embodied carbon number moved too. All four are worth knowing before you specify it.

Sustainability · 4 min
Read

These entries are written for a demonstration build. The projects, figures and incidents described in them are invented, though the construction practice they discuss is not.